Project scale: 40MW/193MWh, a total of 96 energy storage containers
Project address: Gangba County, Tibet, with an altitude of 4,700 meters and a minimum temperature of -25.1 °C
Delivery: August 2020
Project introduction: The world's highest altitude and the largest domestic photovoltaic storage integration project, 2020/9/30, the first energy storage unit was successfully connected to the grid. The project includes box, security, fire protection, air conditioning, air duct, and the production cycle is 30 days
 
   
 